Successful Developments Previously sold

Arbroath battery storage

Arbroath battery storage(Angus, Scotland)

  • Capacity:35MW
  • Status:consented and sold to Gresham House fund
  • Operational
Couper Angus battery storage

Couper Angus battery storage(Perth, Scotland)

  • Capacity:40MW
  • Status:consented and sold to Gresham House fund
  • Operational
Keith Battery Storage

Keith Battery Storage(Moray Scotland)

  • Capacity:39mw
  • Status:consented and sold to Field Energy.
  • Operational

BESS project currently in a JV to construct and operate in partnership with Eren Industries

Walsoken Battery Energy Storage System (BESS)

Walsoken Battery Energy Storage System site location

A Strategic UK Energy Storage Development

Bia Power is developing the Walsoken Battery Energy Storage System (BESS), a utility-scale energy infrastructure project located near Wisbech in Norfolk, England. The project is designed to support the UK's transition to a cleaner, more flexible and more resilient electricity grid.

Walsoken benefits from secured land rights, planning consent and an accepted grid connection offer, positioning the project as an advanced Ready-to-Build battery storage opportunity in the UK market.

The development has been structured with optionality: it can be delivered as a 200MW / 2-hour merchant BESS, or adapted into a 150MW / 8-hour long-duration energy storage configuration designed to target more stable, contracted revenue frameworks.

Project Overview

ItemDetails
ProjectWalsoken Battery Energy Storage System (BESS)
LocationApproximately 1 km east of Wisbech, in the West Norfolk District of Norfolk, England
Local AuthorityBorough Council of King's Lynn and West Norfolk
CoordinatesX = 548511, Y = 309643
Proposed Capacity200MW / 2-hour configuration for the merchant business case, or 150MW / 8-hour configuration for a long-duration / CfD-style revenue case
Land StatusSingle landowner; option to lease signed; option expiry year 2030
AccessNo third-party access required
Planning StatusApplication consented in July 2025
Grid ConnectionPreliminary grid offer accepted for 200MW unconstrained
DNOUK Power Networks (UKPN)
Connection PointNorth Anglia Connection Node D 132kV Substation
Grid Connection Date30 September 2034, with potential to benefit from UK grid queue reforms and prioritisation of advanced projects
Connection CostApproximately £63,000 per MW

Flexible Development Strategy

Walsoken has been designed with flexibility in mind. The project can be developed under two distinct commercial strategies depending on market conditions, investor appetite and the preferred risk-return profile.

Merchant BESS Model - 200MW / 2-Hour Configuration

  • The existing layout is designed around a 200MW / 2-hour system.
  • This configuration is suited to the merchant business model, including participation in the Balancing Mechanism, Capacity Market, energy arbitrage and ancillary services.
  • The 200MW configuration is well suited to short-duration grid flexibility and offers potentially higher returns, albeit with greater merchant revenue exposure.

Layout below showing the 200MW / 2-hour configuration:

Layout showing the 150MW / 8-hour BESS configuration

Long Duration Energy Storage Model - 150MW / 8-Hour Configuration

  • Using suitable technology, the site can potentially be configured as a 150MW / 8-hour long-duration storage project.
  • This configuration is intended to align with the UK's Long Duration Energy Storage framework, including cap-and-floor or CfD-style revenue support structures where applicable.
  • The long-duration route is designed to enhance bankability by targeting more stable, contracted revenue streams and reducing exposure to purely merchant revenues.
  • The trade-off is higher capex and greater procurement and delivery complexity compared with the 200MW / 2-hour merchant configuration.

Layout below showing the 150MW / 8-hour configuration:

Battery energy storage facility supporting grid flexibility

Positioned for the Future UK Grid

The UK battery storage market is entering a new phase of maturity. Previous headwinds, including uncertainty around market reform, high interest rates, elevated capex and grid connection uncertainty, are now beginning to ease.

Walsoken is well placed to benefit from this shift. The project has secured land, achieved planning consent and accepted a grid connection offer. These characteristics are expected to be important as National Grid and network operators continue reviewing the connection queue and prioritising advanced, deliverable projects.

As a large-scale, consented BESS project with commercial flexibility, Walsoken is positioned to support the UK's growing requirement for flexible capacity, renewable integration and long-duration storage solutions.

Supporting the Energy Transition

The Walsoken BESS project is expected to contribute to the UK energy transition by:

  • Increasing grid flexibility and resilience.
  • Supporting the integration of renewable generation.
  • Providing capacity to help balance electricity supply and demand.
  • Reducing curtailment and system balancing costs over time.
  • Improving energy security by enabling more efficient use of domestic renewable power.
  • Providing an investable platform for either merchant flexibility revenues or longer-term contracted revenue structures.

Projects still Available for new business

Fiddes Battery Storage (Aberdeenshire, Scotland)

Fiddes Battery Storage (Aberdeenshire, Scotland)

  • Capacity:30mw
  • Status:Ready to Build
Drumlithie Battery Storage (Aberdeenshire, Scotland)

Drumlithie Battery Storage (Aberdeenshire, Scotland)

  • Capacity:49.9mw
  • Status:Ready to Build

Bia Power is actively looking for new investors for its projects, and any investors please get in touch with us at [email protected]